Harnessing Energy from Waste in the Dominican Republic
Streamline Integrated Energy is bringing forth SPM-Planta Basura@Energía in San Pedro de Macorís - the first utility-scale, waste-to-energy plant in the Caribbean.
Our Mission
We transform how cities manage waste by developing projects that reduce reliance on landfills, improve environmental conditions, and contribute long-term energy value to the grid.
Key Milestones
SPM-Planta Basura@Energía in San Pedro de Macorís, First in the Region
20-Year PPA Signed on April 10, 2026
100% of Injected Energy Contracted at a 55 MW Capacity
Approximately 350 TPD Waste Processing Design
Long-Term Power Purchase Agreement
20-Year Utility-Backed
Streamline Integrated Energy’s flagship project, SPM-Planta Basura@Energía, is supported by a 20-year Power Purchase Agreement with Empresa Distribuidora de Electricidad del Este, S.A. (EDEESTE), one of the Dominican Republic’s state-owned electricity distribution utilities.
The signature of this contract on April 10, 2026 is a milestone that materially strengthens the project’s commercial profile by establishing a long-term offtake framework while supporting revenue visibility, project bankability, and long-term infrastructure financing.
Contract Pillars & Fundamental Terms
20-year term from commercial operation date
State-backed distribution utility offtaker
100% of the plant’s injected energy contracted
55 MW of contracted capacity
Priority in dispatch
Transparent pricing mechanism linked to fuel indices and regulatory parameters
Commercial structure designed to support project-finance-style debt and institutional equity participation
Our Flagship Project
SPM-Planta Basura@Energía is SIE’s flagship project in San Pedro de Macorís, Dominican Republic. The project is designed to transform municipal solid waste into utility-scale power through a modern waste-to-energy platform tailored to the country’s environmental and energy needs.
As a first-of-its-kind platform asset in the Dominican Republic and the wider Caribbean region, the project aims to reduce reliance on landfills, address long-standing waste management pressures, and provide reliable power capacity through an integrated infrastructure solution.
Project Snapshot
Project: SPM-Planta Basura@Energía
Location: San Pedro de Macorís, Dominican Republic
Type: Waste-to-Energy / Energy Recovery
Strategic role: Waste management plus power generation platform
Design processing capacity: Approx. 350 TPD municipal solid waste
Output energy capacity: 55 MW
Why this Project Matters